Power Automation Team Engineering and Commissioning Company
PAT- Projects Reference with multi nationals Companies
• Removal old panels, New DCS Installation and replacement Supervision.
• Commissioning and Startup, Normalize DCS system units back to commercial operation.
• Owner staff Training courses – DCS plant O&M courses.
- New DCS parts installation commissioning and Startup, Normalize DCS system units back to commercial operation.
- Owner staff Training courses – DCS plant O&M courses.
- DCS Installation, HW/SW Modifications, configuring DCS for normal operation
- Commissioning, start up Activities and powering up system.
- Owner staff Training courses – DCS plant O&M courses.
- BOP Plant Commissioning, Startup and Operation Team.
- HRSG Boiler Commissioning, Startup and Operation Team.
- PLC Sematic S7 SIEMENS IO loop, device check and commissioning.
- (CWP) Commissioning, startup, Operation Scope.
- Plant IO loop, Device check, commissioning and startup normalizing the system and beck to commercial operation.
- GE-GT Loop and Device check Commissioning and startup plus.
- DCS Ovation Operation training – Owner Staff Training courses – DCS plant O&M courses.
- Alsohm DCS IO loop and I&C device Commissioning Team.
- Engineering (DB, logic, Graphics) SW ready for FAT
- DCS SW/HW Installation and programming, Commissioning, start-up, powering up DCS system, normalizes operation and ready for Plant commissioning.
- Plant IO loop, Device checks, commissioning and startup units normalized to normal operation all systems and handing over to Owner staff for commercial operations by Saudi electricity.
- Owner staff Training courses – DCS plant O&M courses.
- DCS Complete Removal and Installation scope and DCS migration activities.
- Plant device check and test, commissioning plant systems and back to normal operation.
- Owner staff Training courses – DCS plant O&M Courses.
- Removing the old TCS control cabinets and install the new Ovation DCS system – complete installation scope.
- Plant Commissioning, Startup and Operation IBDROLA scope.
- New DCS Installation supervision, SW installation, powering up DCS system and make it ready for GT commissioning and start up.
- GT’s IO loop, device check and plant Commissioning and normalizing the units after reliability test and back to commercial operation by Saudi electricity co.
- Guarantee period is our scope plus Owner staff Training courses – DCS plant O&M courses.
- New DCS Installation supervision, SW installation, powering up DCS system and make it ready for GT commissioning and start up.
- GT’s IO loop, device check and plant Commissioning and normalizing the units after reliability test and back to commercial operation by Saudi electricity co.
- New Ovation DCS – APS “Automatic Plant Start” SW program check, troubleshooting modification to make it work as one PB plant start.
- Plant systems commissioning and start-up.
- Plant IO loop, Device checks, commissioning and startup units normalized to normal operation all systems and back to commercial operations by Owner Saudi electricity.
- DCS HW/SW modifications system configuration.
- PLANT’s IO loop, Device check, Commissioning and Start up Scope.
- Warrantee Period covered by PAT engineer
- Site management, Supervising, Inspect and checkout the new DCS parties removal and replacement new DCS – very tight schedule to complete the upgrading.
- Startup and commissioning the new DCS and powering system configuring it for normal operations.
- Plant devices check and test “DB, Graphics, Logic …” HW/SW modifications.
- Cold/Hot test activities for plant devices and normalizing DCS back to normal commercial operation.
- Owner Training courses – DCS plant O&M courses.
- GT3 – Start-up, operation troubleshooting and solution.
- New FCV Installation supervision, SW installation, ready for GT commissioning and start up.
- GT9 IO loop, device check and plant Commissioning and normalizing the units after reliability test and back to commercial operation by Saudi electricity co.
- I&C commissioning scope “4 HRSG, BOP, STG, ACC plants”
- IO cold / Hot loop test “4 HRSG, BOP, STG, ACC plants”
- Plant Devices Functional test “4 HRSG, BOP, STG, ACC plants”,
- Work flow procedures improvements, established Academy for Marafiq training center Creating training materials courses for Engineers/Supervisors and technicians, for Operation and maintenance courses,
- Our team carried out the necessary trouble shooting in electrical generator systems switch gears and emergency and PLC’s, our team completed his task and handing over the ship to the first engineer within 10 days after ship was stopped for years.
- PAT worked together with the GIZA/Emerson team on the SHOAIBA POWER PLANT STAGE I, PHASE 1 DCS Re-Habitation project “ABB to EMERSON Ovation” from January 2021 to 2022. The project involved various activities, including IO loop checks, device tests, and commissioning of boiler, turbine, BOP, desalination, and demi water, as well as troubleshooting of the DCS Ovation system with the Emerson team.
- The PAT team provided comprehensive support throughout the project, and the project construction schedule was very tight to return the power plant into commercial operation. The project involved multiple technical aspects, and collaboration between different teams with varied expertise was required to ensure successful completion.
- PAT worked together with SF/Emerson team on a project in collaboration with KBR design company. The project involved various activities, including engineering document review, verification of cabinet/marshaling staging before FAT, supervision of construction activities, commissioning of hot/cold tests for each PIB shutdown, and troubleshooting of the Delta V system with Emerson team.
PAT team provided comprehensive support throughout the project, Overall, project was complex, involved multiple technical aspects, and required collaboration between different teams with varied expertise to ensure successful completion.