Skip to content
Power Automation Team

Electrical & PLC troubleshooting

El Esraa petroleum tanker ship, Alexandria

  • Egypt
  • 2020

Project overview

Troubleshooting of generator systems, switchgear, emergency systems and PLCs; the ship was handed over to the first engineer within 10 days after standing idle for years.

Scope of work

  • Troubleshooting of the electrical generator systems, switchgear, emergency systems and PLCs
  • Task completed and the ship handed over to the first engineer within 10 days, after being stopped for years

Planning something similar?

Talk to the team that has done it before.

Contact PAT