Skip to content
Power Automation Team

New DCS

Marafiq Yanbu II 3×270 MW

  • Saudi Arabia
  • 2014–2017
  • Emerson DCS

Project overview

DCS hardware and software modifications and system configuration, IO loop and device checks, commissioning and start-up, with warranty-period coverage by a PAT engineer.

Scope of work

  • DCS hardware and software modifications and system configuration
  • Plant IO loop and device checks, commissioning and start-up
  • Warranty period covered by a PAT engineer

Planning something similar?

Talk to the team that has done it before.

Contact PAT