DCS upgrade — DeltaV
Abqaiq plants — DCS upgrade, PIB-2 to PIB-18 (Aramco)
- Saudi Arabia
- 2022–2023
- Emerson DeltaV
Project overview
DCS upgrade across twelve PIBs: document review, cabinet staging checks before FAT, construction supervision and hot and cold tests for each PIB shutdown.
Scope of work
- Engineering document review and verification of cabinet and marshalling staging before FAT
- Supervision of construction activities
- Hot and cold test commissioning for each PIB shutdown
- Troubleshooting of the DeltaV system with the Emerson team
- Work carried out with the Saudi FAL / Emerson team in collaboration with the design company KBR