Abqaiq plants — DCS upgrade, PIB-2 to PIB-18 (Aramco)

  • Saudi Arabia
  • 2022–2023
  • Emerson DeltaV

Project overview

DCS upgrade across twelve PIBs: document review, cabinet staging checks before FAT, construction supervision and hot and cold tests for each PIB shutdown.

Scope of work

  • Engineering document review and verification of cabinet and marshalling staging before FAT
  • Supervision of construction activities
  • Hot and cold test commissioning for each PIB shutdown
  • Troubleshooting of the DeltaV system with the Emerson team
  • Work carried out with the Saudi FAL / Emerson team in collaboration with the design company KBR